TL;DR

Decide whether you are planning or preparing actual work

A buyer may want utility information to price a drainage change, driveway or other ground-disturbing renovation. That is not the same as having an authorized contractor ready to excavate. Tell the appropriate designer or contractor what you need to learn, what access the owner allows and whether actual work is scheduled.

Georgia 811's published law page distinguishes a design locate request for bidding, predesign or advance planning from an excavation locate request. It says a design locate request is not to be used for excavation. Do not request an excavation marking merely to make a speculative purchase file look complete.

The law page contains amendment-style wording. This guide does not rely on it for a numerical notice period, exception, tolerance-zone instruction or liability conclusion. Confirm the current process for the actual work with Georgia 811 and the responsible professionals. The Georgia Public Service Commission's facilities-protection office is the state enforcement reference, not a substitute for a property-specific work plan.

Give the right person a usable scope

Write down the property's location, proposed work area, type of work and whether it is still a design inquiry. Identify the party responsible for submitting and managing the appropriate request, responding to questions and coordinating any follow-up. Keep the owner's access authorization separate.

The current Georgia 811 process asks for details including the planned digging location, directions, nearby intersecting street, type of work and planned timing. Those details matter because the response concerns a described site and task. A request covering one area does not establish that a different area was investigated.

If the work changes, have the responsible party confirm what updated coordination is needed. Do not reuse a seller's old ticket as blanket coverage for a new renovation. A ticket number records a request; it does not independently establish that your present work is covered.

Submission, markings and responses are different evidence

Georgia 811 explains that it notifies the relevant utility companies, which send locators to mark approximate underground locations. It then directs users to check the utility responses online before digging and to contact 811 again for missing responses or problems.

Its process also calls out visible and obvious evidence of an unmarked utility. Do not erase that concern merely because a screen shows responses. Give the discrepancy to the responsible contractor and Georgia 811 for proper resolution before ground disturbance. This article is not authorization to proceed or a guide to exposing facilities.

Ask the relevant utilities and qualified parties what their responses cover, where their responsibility ends and whether additional private-facility investigation is needed. Do not promise that all customer-owned lines, abandoned facilities or sewer connections have been located. The exact scope must be established for the site rather than inferred from the word “clear.”

Keep access, utility evidence and project approval separate

Question Evidence to retain What does not answer it?
May the buyer or contractor access the property? Actual owner authorization and agreed limits A locate request
What was requested? Design or excavation request, described work area and current status An unrelated historical ticket
What location information was returned? Relevant utility responses, markings and unresolved discrepancies Request submission alone
What remains outside scope? Utility and qualified-party clarification, further coordination required Assuming all buried items are covered
Is the utility functional or suitable? Appropriate condition or capacity evaluation Paint marks on the ground
May the proposed project be built? Applicable project and permit review Utility location information

This original coordination worksheet is for organizing a purchase decision. The contractor and applicable authorities must determine the procedures and requirements for the actual work. It supplies no digging method, excavation exemption or technical clearance.

An invented drainage-project mismatch

Fictional purchase exercise: a seller shows an old ticket for front-yard work. The buyer's proposed rehab adds drainage work in the rear yard. There is no current request or response file matching that scope, and the buyer has not obtained permission for intrusive investigation.

The front-yard record does not answer the rear-yard plan. The buyer first arranges appropriate owner authorization and asks the designer or contractor which planning information is needed. The responsible party distinguishes that inquiry from any later excavation process and resolves scope and response gaps before work. The buyer keeps the drainage price and schedule provisional until there is enough evidence to support them.

Use the utilities-off inspection guide when the question is operational testing or safe restoration. That is a separate task from locating buried facilities. Carry supported work and timing into the complete purchase budget.

Georgia sources checked November 16, 2026; refresh by December 14, 2026 and when the project or process changes. Georgia only. No request submitted, field location performed or permission to excavate established.

For coached practice evaluating rehab readiness, explore Deal 90. Utility coordination and qualified site work remain separate responsibilities.